Flow of production
1.Inquiry
Please input and contact a necessary matter from the
inquiry form me. (Accept by telephone. )It doesn't care easily, and fill in what site, please ..whether aim...
I will contact one business days or less.
2.Meeting
Please let me submit the estimate for the number of pages and the production period based on the content hears from the customer by hearing. It confirms and it advances to the procedure of the contract after it is consented. A necessary matter ..contract.. is filled in later because it will be possession (Or, mail it) and it becomes a formal contract.
3.Preparation for material
Please prepare the material (photograph, image, and illustration) necessary for website making and the manuscripts, etc. on the customer side. The material prepared here is placed in the website. Our company will produce an image simple processing about the menu button etc. and the publishing image necessary for the layout of the page (design) necessary minimum.
4.Design submitting
I will produce the top page design and the site map by our company at the same time as preparing customer's material and present it. It confirms it, and please get the instruction of the correction if there is a necessity and confirm it again. I will assume the design and the site map of top page to be fixation here. It separately becomes an estimate at the page after it acknowledges it and the addition of contents.
I will submit the design to five business days or less.
5.Production beginning
The design is decided and it hangs in contents page production based on the material that the customer prepared. Because the status of production will be up-loaded to our server by temporary, the thing always confirmed with a personal computer on hand is possible. Customer's server and domain are acquired by the contract situation and when it is effective, I will up-load it to that server.
6.Confirmation
Please check errata of sentences and omission of a words of the layout, etc. doing. Please the instruction of the correction must be gotten if there is a necessity, our company must correct, and confirm it again. There is not a thing of generating the extra charge because there are no limitation etc. about the correction frequency either.
7.Test
The final test is done. Please do confirming the operation the form etc.The final reminder and the test work before it up-loads it here are ended. Please get the instruction of the correction if there is a necessity, correct, and confirm it again. It separately becomes an estimate at the contents addition after a final answer is gotten.
8.Up-loading
I will formally up-load to customer's acquisition domain and open the homepage to the public. The delivery of goods becomes a server with the delivery of goods that saves data in the storage media etc. such as up-loading or CD-ROM. I will assume the production business to be completion by this.
9.About the maintenance after goods is delivered
In the case of a Template plan, an original plan, menthene of moon becomes the plan to perform. In addition, I can adapt myself to the update frequency of the visitor about the maintenance after the production and make an estimate.